Company: Ebony Glass & Mirror Co., Inc.
Project Name: Georgia State University-Campus Wide ADA
Project Location: 75 Forsyth St Atlanta, Georgia 30303
Bid Due Date: 03/07/2018 14:00 PM EST
Click Here to View the Project
Project Status: GC and Sub Bidding
Construction Type: Commercial
Labor Status: NA
Project Description:
This project includes ADA improvements to 8 locations for Georgia State University. 1. GSU Decatur Campus, Building SC, 3251 Panthersville Rd., Decatur, GA 30034 – provide ADA accessible restrooms on the ground floor. 2. GSU Downtown Campus, Noah Langdale Hall, 38 Peachtree Center Ave. SE, Atlanta, GA 30303 – upgrade exterior stair handrails at the Peachtree Center Avenue entrance. 3. GSU Downtown Campus, Urban Life Building, 140 Decatur St. SE, Atlanta, GA 30303 – provide ADA accessible restrooms on the 2nd and 4th floors. 4. GSU Downtown Campus, Haas Howell Building, 75 Forsyth St. NW, Atlanta, GA 30303 – provide ADA accessible restrooms on the 6th, 7th, and 8th floors (Deductive Alternates #1, #2, and #3), provide ADA-compliant hardware throughout the work area, and install additional audible and visual fire alarm devices. 5. GSU Downtown Campus, Natural Science Center, 50 Decatur St. SE, Atlanta, GA 30303 – install additional audible and visual fire alarm devices. 6. GSU Downtown Campus, Standard Building, 92 Luckie St. NW, Atlanta, GA 30303 – install additional audible and visual fire alarm devices. 7. GSU Downtown Campus, Rialto Center for Performing Arts, 80 Forsyth St. NW, Atlanta, GA 30303 – install additional audible and visual fire alarm devices and install ADA-compliant signage. 8. GSU Downtown Campus, Library North, 100 Decatur St. SE, Atlanta, GA 30303 – provide ADA accessible restrooms in the basement.
Special Instructions:
Project scope addresses ADA accessibility issues at eight GSU sites. All sites are at the Downtown and Decatur locations.
Project Link: Georgia State University-Campus Wide ADA
Recent Comments